Case Study - Sue Ryder

Sue Ryder

Sue Ryder

The new modular facilities enable the charity’s clerical staff to move from an inadequate and cramped attic space in an existing building into appropriate, operational office space situated on a grassed area surrounded by protected trees.

The project was delivered within a very tight budget and time frame. The building arrived onsite in panel form, which was erected within a day, the roof was in place the day after and subsequently the timber cladding was completed.


Project Specification

  • Size – 974 sqm
  • Scope of Works –
    • Design feasibility
    • Planning
    • Groundworks
    • Panel manufacture and erection
  • Timescales – 8 weeks
  • Build Method – Panel form