Case Study - Knole Academy

Knole Academy

Knole Academy

A two-storey classroom facility using 30 separate bays provided 6 additional classrooms along with additional office space and pupil washroom facilities; installed during the summer holidays to minimise disruption.

View Timelapse of the project


Project Specification

  • Size – 1075 sqm (11500 sq ft) total floor area
  • Scope of Works –
    • Fully re-furbished internally and externally
    • Plastisol clad
    • Plastisol coated steel profile warm deck roof
    • Steel frame
    • Electric space heating throughout
  • Timescales – 12 weeks
  • Build Method – Highly sustainable, built from pre-owned modules